Fossil Fuel Reduction for Industrial Manufacturing Companies
Reduce Operating Costs
Eliminate Waste Heat
Meet Your Goals
Have You Been Through This Before?
You have walked someone around your site for days doing an energy audit (or roadmap), and all they give you is a long list of projects. No priorities. No next steps.
Everyone at the plant is stretched too thin to figure out what to do next, and you already spent too much time on this. So the report gets filed away and nothing ever happens. Time and money down the drain.
You need someone to deliver a Blueprint of the projects you should do, not everything you could do.
Decarbonization Blueprints
A Decarbonization Blueprint is a set of plans we put together to hit your carbon goals and reduce your fossil fuel spend.
We come to your site and do a deep dive on the major thermal systems, and determine the projects you should do, and in which order, to maximize natural gas (and OpEx) reduction, and minimize capital spend, all while hitting your ROI targets.
We only recommend projects we would do if we were in your shoes. We deeply consider maintenance and redundancy to make sure these projects won’t be a problem down the road.
Our report includeds everything you need to go straight into the engineering phase of the project: total installed costs, vendor quotes, engineering calculations, and energy maps.
We also can help with engineering and construction to free up your time. Think of us as an owners rep, operating as part of your projects arm.
Decarbonization Blueprint - How Does It Work?
We know your time is valuable, so we have as few steps as possible, and work very independantly on-site. Here are the steps and your time commitment:
Intro Call - 30 minutes - Discussion with the site to make sure we aren’t wasting your time and money
Pre-Visit Data Gathering - Week 1 - 1-2 Hours - We ask you for some site information
Site Visit - Week 2 - 4-6 Hours - 3-5 day visit where we gather data, meter equipment, and talk with site personnel
Engineering - Weeks 3-6 - No Time Needed - We run calculations, get quotes from vendors, talk to mechanical contractors, and work with your utilities to see how much incentive money we can get
Presenation - Week 7 - 1.5 Hours - Project recommendations, costs, ROI, site fossil fuel analysis, available incentives and grants, and Q&A
Report Delivery - Week 8 - No Time Needed - We incorporate questions from the presentation, recommended projects, projects not recommended, engineering and cost calcualations, and vendor quotes
Your Total Time Commitment: 8.5 Hours
After we deliver your Blueprint we can give you a proposal for us to create the RFP and bid out the engineering and construction work. We want to keep the ball rolling.
Why Should You Care?
Here is the short answer. We:
Lay out a plan and reduces your OpEx
Hit your ROI targets
Meet corporate goals (sustainability, energy reduction, cost reduction)
Don’t waste your time
And then we help you execute. From project identification through getting the equipment up and running, we can help. We can even bring 3rd party finance to the table if you need it.
You can focus on what needs you most - keeping the plant running.
Lets reduce your carbon emissions and OpEx spend.
Fill out the contact us form below and we will get back to you in less than 24 hours.
Contact Us
Are you an Industrial Manufacturer who is serious about reducing your carbon emissions? We would love to talk.